Electrical Connection EPCC — Water Intake Pump Station to National Grid
Contract for the provision of electrical connection EPCC services for a new water intake pump station to the national grid — including substation equipment, cabling and switchgear installation through to energisation.
Scope of Work
- Substation and transformer installation
- MV/LV switchgear supply and installation
- Cable trenching, laying and termination
- Testing, energisation and commissioning