Mechanical & Tanks · 2019
Six 2,000 m³ Water Injection Tanks & Station Piping
Construction of six water injection tanks of 2,000 cubic metres each, with associated piping construction for the BUN, BUS3 and FQS injection stations serving the Buzurgan and Fauqi oil fields.
Scope of Work
- Tank foundations and ring walls
- Shell erection, welding and testing of six 2,000 m³ tanks
- Interconnecting station piping
- Painting, insulation and cathodic protection
- Hydrotesting and commissioning